The study tracked construction around the tunnel outlet downstream of Medog County
Fresh Construction At China's 'Mother Of All Dams', Geospatial Survey Shows
In short
Recent findings confirm ongoing development on China's massive dam project following an analysis of spatial data. The geospatial survey detected fresh construction efforts taking place near the facility's tunnel outlet. Located downstream of Medog County, this specific area has become a focal point of monitored engineering activity. The documented operations provide clear evidence of active progress at the remote site.
Key points
- Geospatial survey data confirms that active development continues on the massive dam faci…: Geospatial survey data confirms that active development continues on the massive dam facility.
- Monitored progress on the project is currently concentrated around a downstream tunnel ou…: Monitored progress on the project is currently concentrated around a downstream tunnel outlet.
- Medog County serves as the geographic reference point for the newly observed construction…: Medog County serves as the geographic reference point for the newly observed construction activity.