Technology1 min read

ERP gantries come down as Singapore prepares for satellite-based charging from Jan 1

By · Published by Everything Blog

In short

The Land Transport Authority is removing or modifying 62 non-operational gantries across the island, with all 95 structures scheduled for decommissioning or repurposing by June 2027. Meanwhile, 33 operational gantries will stay active until Dec 31 to handle toll collections under the outgoing setup. Certain structures will be retained to mount auxiliary equipment in zones where satellite reception remains weak. Drivers will rely on newly painted blue oval lane markings, roadside signs, and on-board unit alerts to track road pricing fees.

Key points

  • Satellite navigation will automatically track passing vehicles to assess tolls without ne…: Satellite navigation will automatically track passing vehicles to assess tolls without needing physical road gantries.
  • Motorists will receive advance entry notifications, real-time rates, and final fee confir…: Motorists will receive advance entry notifications, real-time rates, and final fee confirmations through their vehicle on-board units.
  • Select gantry structures will be retained to host devices that bolster the ERP 2 network…: Select gantry structures will be retained to host devices that bolster the ERP 2 network in areas with poor satellite signals.

Sources checked by our analysis pipeline: 1

New road markings, signs and on-board unit alerts will show motorists where charges apply once satellite-based charging begins.

SINGAPORE: Physical Electronic Road Pricing (ERP) gantries are starting to disappear from Singapore's roads, with 12 removed as of Wednesday (Nov 18) ahead of the switch to satellite-based charging on Jan 1.

The gantries dismantled so far include those at Bencoolen Street, Geylang Bahru and Republic Boulevard, as well as several around the Kallang-Paya Lebar Expressway and along Dunearn Road.

They are among 62 non-operational ERP gantries being progressively removed or modified since works began in October.

The remaining 33 gantries remain operational and will continue to charge motorists until Dec 31. The Land Transport Authority (LTA) expects all 95 gantries to be removed or modified by June 2027.

Not every gantry structure will go. Some will be retained and repurposed to carry devices that support the new system, known as ERP 2, in areas where satellite signals may be less reliable.

LTA said works will be scheduled progressively, taking into account site and traffic conditions to minimise inconvenience to motorists.

NEW…

Technology